A company in West Yorkshire has awarded Magma Combustion Engineering the first stage of a larger contract based around their plant development. The customer is looking to expand their operations and require new process equipment installing, but the main gas distribution pipework is blocking the access routes. Magma Combustion Engineering will design, pre-fabricate and install new gas distribution pipework prior to changeover and test of the new system as the customer produces 24 hours a day so turning off the gas supply for a long period isn’t feasible. The changeover will be performed during their Christmas shutdown so production isn’t affected.